INITIALIZING EXODIUS_31579
FTC TEAM 31579

EXODIUS FTC

EST. 2025 // FREMONT, CA
EXECUTION_IN 00:00:00:00
2 Week

Iteration Cycles

Continuous CAD prototyping.

350+

CAD Hours

In Onshape & Fusion.

12k

Java Lines

Advanced control loops.

01

KICKOFF

Strategy focus: Prioritizing rapid artifact cycling over endgame tasks.

02

CAD V1

Math-based trajectory modeling to validate launch parabolas.

03

BUILD V1

Rapid prototype (wood/print) to test intake geometry and grip.

04

CAD V2

Designing the Turret Hood and "Kicker" transfer mechanism.

05

BUILD V2

Integration of active turret aiming and widened intake path.

06

QUAL #1

Stress testing revealed latency in the "Kicker" feed system.

07

CAD V2.5

Re-engineering transfer system for "Instant Feed" (Zero-Delay).

08

BUILD V2.5

Final assembly with Rhino wheels.

09

QUAL #2

Competition Ready: Consistent 3-shot bursts in < 1.0 seconds.

REC
CAM_01 // WIDE_ANGLE